ELMAZ Construction

Your bathroom,
beautifully built.

Bring your ideal bathroom to life: bespoke design, expertly built with a focus on quality and detail.

Over 500 bathrooms renovated.

"We could not be happier with our bathroom by ELMAZ."

Andrea

Cockfosters, EN4

"What I imagined, Elmaz delivered. I love my bathroom."

Jackie

Finsbury Park, N4

"I just love my new bathroom. Thank you to the team."

Victor

Walthamstow, E17

Bathroom Gallery

View some of our bathroom case studies, looking at how we take a bathroom from removing the first tile to installaing the last one.

The process

Understanding Your Bathroom Renovation Journey.

A clear, well-managed renovation should feel straightforward from the outset. Here is how a typical bathroom project moves from first enquiry through to final completion.

01

Consultation & Quotation

We begin by understanding your space, your goals, and the finish you want to achieve. After that, we prepare a clear quotation so you know exactly what is included before any work begins.

Typical timeframe: 1–3 days
02

Planning & Preparation

Once approved, we finalise the finer details, agree materials, confirm the scope of works, and prepare everything needed for a smooth start on site.

Typical timeframe: 3–7 days
03

Strip-Out & First Fix

The existing bathroom is carefully removed, and the groundwork begins. This usually includes plumbing, electrics, structural prep, and making the room ready for installation.

Typical timeframe: 2–4 days
04

Installation & Finishes

This is where the space comes together. Tiling, waterproofing, flooring, sanitaryware, lighting, and finishing details are all installed with close attention to quality and alignment.

Typical timeframe: 4–7 days
05

Final Checks & Handover

Before sign-off, we check the finish properly, complete the final details, and make sure everything is left clean, complete, and ready to use.

Typical timeframe: 1 day

Your bathroom, designed.

Bring your ideal bathroom to life: bespoke design, 3d rendering, 2d plans.

Bathroom renovation questions

A typical bathroom renovation takes around 7 to 10 days from start to completion, depending on the size of the space, the specification, and whether any additional remedial works are needed once the room is stripped out.

No. We provide quotations free of charge, so you can understand the likely scope, cost, and approach before making any commitment.

We typically provide the raw building materials needed for the renovation. Finishing products such as tiles, sanitaryware, brassware, and furniture are usually client supplied, although we can assist with sourcing and procurement where needed.

Yes. We can assist with layout ideas, practical planning, and finish selections to help make sure the bathroom feels cohesive, functional, and well considered before work begins.

Yes. We manage the bathroom renovation from strip-out through to installation and final finishing, so the process stays straightforward and the quality remains consistent throughout.

Yes. Wet areas are prepared properly and waterproofed where required to protect the space and support a long-lasting finish. This is an important part of delivering a bathroom that not only looks good, but performs properly over time.

Yes. We can help shape the scope of works around your budget and advise where best to allocate spend, so the final result still feels well finished and properly considered.

Yes. You will have a dedicated point of contact throughout the project, so communication stays clear and the renovation remains organised from start to finish.