Canary Wharf, London, E1W
Extension and Full Internal Renovation
Completion Date: October 2025
Project Duration: 14 weeks
Sahil and Sugandha had just purchased their new home, full of potential but held back by a closed-off layout. The kitchen, dining, and lounge felt disconnected, with walls breaking up both light and flow.We opened the space up by removing internal divisions and introducing a carefully designed steel framework to support a full-width opening. This allowed us to seamlessly connect the kitchen, dining, and lounge into one continuous, open-plan environment. Beyond this, we carried the same approach throughout the rest of the house, reworking layouts to maximise space and usability. The bathroom was repositioned and opened up, creating a more practical and comfortable footprint that better suited modern living. The result is a brighter, more spacious home that flows effortlessly, transforming how Sahil and Sugandha live, host, and enjoy their space every day.
Sahil