Queensway, London, W2
Bathroom Renovation
Completion Date: February 2026
Project Duration: 1 week
Jess came to us looking to transform a tired, dated bathroom into something far more refined and functional. The existing space felt cramped and uninspired, lacking both character and practical use. We reworked the layout to maximise every inch, introducing a clean bath and shower combination with a sleek glass screen to keep the space feeling open. The design centred around warm, textured tiling paired with brushed brass fittings, bringing a sense of depth and understated luxury. A recessed, LED-lit niche was built in to add both practicality and a subtle feature detail.Every element was carefully considered to balance style and usability, resulting in a bathroom that feels calm, cohesive, and effortlessly premium, completely transforming Jess’s day-to-day routine.
Jess